To Erect The Container


Erecting The UNISEG Container From Its Collapsed Position:

To erect the UNISEG Container from its collapsed position to the front load configuration, carry out the following steps;
Step 1 – Lift up top panel (allow over-rotation to pull second panel up)
Step 2 – Lift up next panel (firmly “lock –in” to rear panel)
Step 3 – Lift up next panel (lock – in to rear panel)
Step 4 – Lift the front & top panel up to top position (latch in place)
The  UNISEG Container is now ready to receive front loaded goods.

Print Friendly, PDF & Email